THE PENTAGON BUILDING PERFORMANCE REPORT

 

January 2003

 

Source:  http://fire.nist.gov/bfrlpubs/build03/PDF/b03017.pdf 

Homepage:  http://fire.nist.gov/bfrlpubs/build03/art017.html

 

(Note:  Not all of the text or pictures are listed here. Yellow highlights are mine. Click thumbnails for full-size photos. Flight 77 homepage)

 

ABSTRACT

Following the September 11 crash at the Pentagon of an airliner commandeered by terrorists, the American Society of Civil Engineers established a building performance study team to examine the damaged structure and make recommendations for the future. The members of the team reviewed available information on the structure and the crash loading and drew on focused assessments by others. In addition to analyzing the essential features of column response to impact, they investigated the residual frame capacity and the structural response to the fire. Plausible mechanisms for the response of the structure to the crash were established. Recommendations are offered for future design and construction along with suggestions for research and development.

The material presented in this publication has been prepared in accordance with generally recognized engineering principles and practices, and is for general information only. This information should not be used without first securing competent advice with respect to its suitability for any general or specific application.

THE PENTAGON BUILDING PERFORMANCE REPORT AUTHORS

Paul F. Mlakar, Ph.D., P.E., Lead; Technical Director; U.S.Army Corps of Engineers

Donald O. Dusenberry, P.E.; Principal; Simpson Gumpertz & Heger, Inc.

James R. Harris, Ph.D., P.E.; Principal; J.R. Harris & Company

Gerald Haynes, P.E.; Fire Protection Engineer; Bureau of Alcohol, Tobacco, and Firearms

Long T. Phan, Ph.D., P.E.; Research Structural Engineer; National Institute of Standards and Technology

Mete A. Sozen, Ph.D., S.E.; Kettelhut Distinguished Professor of Structural Engineering; Purdue University

 

TABLE OF CONTENTS

EXECUTIVE SUMMARY...............................................1
1.       Introduction..................................................2
1.1     Sponsor and Purpose.....................................2
1.2     Study Team..................................................3
1.3     The Pentagon...............................................3
1.4     The Crash ....................................................4
1.5     Extent of Damage .........................................4
1.6     Scope of Report.............................................4
2.       Review of Building Information........................5
2.1     Documents for Original Construction.................5
2.2     Documents for Renovation .............................9
3.       Review of Crash Information ........................12
3.1     Aircraft Data................................................12
3.2     Eyewitness Interviews...................................12
3.3     Security Camera Photographs........................14
3.4     Precollapse Photographs ..............................17
3.5     Photograph Taken during Collapse ................17
3.6     Postcollapse Photograph ..............................18
3.7     Summary of the Impact................................18
3.8     Fatality Information......................................20
4.       Review of Other Studies................................22
4.1     Renovation Engineer ....................................22
4.2     Reconstruction Engineer ................................22
4.3     Corps of Engineers Study...............................23
4.4     Urban Search and Rescue Engineers ...............23
5.       BPS Site Inspections......................................24
6.       Discussion ...................................................35
6.1     Impact Damage ...........................................35
6.2     Fire Damage.................................................41
6.3     Exterior Wall Upgrades...................................44
7.       Analysis ......................................................45
7.1     Response of Columns to Impact.....................45
7.2     Load Capacity of Floor System .......................50
7.2.1  Flexural Strength of Floor System

         with Missing Columns ....................................50
7.2.2  Strength of Floor System in Collapse Area .......51
7.3     Thermal Response of Columns and Girders .....54
7.3.1   Loading......................................................54
7.3.2   Response ...................................................56
8.       Findings ......................................................62
9.       Recommendations .......................................63
9.1     Design and Construction................................63
9.2     Research and Development ...........................63

 

EXECUTIVE SUMMARY

The Pentagon, the headquarters of the United States Department of Defense, was constructed between September 1941* and January 1943. A major renovation of the entire 6.6 million sq ft facility began in 1999 and is scheduled for completion in 2010. On September 11, 2001, a hijacked commercial airliner was intentionally crashed into the building in an act of terrorism. One hundred eighty-nine persons were killed and a portion of the building was damaged by the associated impact, deflagration, and fire. That same day the American Society of Civil Engineers established a building performance study (BPS) team to examine the damaged structure and make recommendations for the future. Team members possess expertise in structural, fire, and forensic engineering.

*Notice they didn't put the day which was the 11th!

The BPS team’s analysis of the Pentagon and the damage resulting from the attack was conducted between September 2001 and April 2002.The members of the BPS team inspected the site as soon as was possible without interfering with the rescue and recovery operations. They reviewed the original plans, the renovation plans, and available information on the material properties of the structure. They scrutinized aircraft data, eyewitness information, and fatality records; consulted with the urban search and rescue engineers, the chief renovation engineer, and the engineer in charge of the crash site reconstruction; and examined the quick, focused assessments of the disaster conducted by the United States Army Corps of Engineers and Pentagon Renovation Program staff.

On the basis of this information the BPS team analyzed the essential aspects of the response of the structural system of the Pentagon to the crash. Impact analyses revealed that the spirally reinforced columns could withstand substantial dynamic lateral loads and deflections. Static analyses indicated that the floor system was capable of significant load redistribution without collapse when several adjacent supporting columns were removed or severely damaged by an extreme action. Thermal analyses showed that the ensuing fire could have sufficiently weakened some damaged frame members to result in collapse within an hour of initiation.

The BPS team concluded that the impact of the aircraft destroyed or significantly impaired approximately 50 structural columns. The ensuing fire weakened a number of other structural elements. However, only a very small segment of the affected structure collapsed, approximately 20 minutes after impact. The collapse, fatalities, and damage were mitigated by the Pentagon’s resilient structural system. Very few upgraded windows installed during the renovation broke during the impact and deflagration of aircraft fuel.

The BPS team recommends that the features of the Pentagon’s design that contributed to its resiliency in the crash—that is, continuity, redundancy, and energy-absorbing capacity—be incorporated in the future into the designs of buildings and other structures in which resistance to progressive collapse is deemed important. The team further advocates that additional research and development be conducted in the practical implementation of measures to mitigate progressive collapse and in the deformation capacity of spirally reinforced columns subjected to lateral loads applied over the height of the column.

 

1. INTRODUCTION

1.1 SPONSOR AND PURPOSE

On the morning of September 11, 2001, as part of a terrorist action involving four hijacked aircraft, a commercial airliner was crashed into the Pentagon. That afternoon the American Society of Civil Engineers established a building performance study (BPS) team of volunteers to examine the structural performance of the building in this catastrophe. This study follows a similar examination of the April 19, 1995, bombing of the Murrah Federal Office Building, in Oklahoma City, and parallels a study of the September 11 World Trade Center terrorist attack.

The purpose of the study was to examine the performance of the structure in the crash and the subsequent fire for the benefit of the building professions and the public. This does not imply that buildings should be expected to survive such events. However, this examination of the Pentagon reveals some useful information about the ability of structures to survive extreme forces.

In fact, the Pentagon structure survived this extraordinary event better than would be expected. Observations comparing and contrasting the construction of the Pentagon to current standards are made where they are pertinent to the observed behavior. Recommendations are also made for studies that could lead to an increased understanding of such phenomena.

 

1.2 STUDY TEAM

The BPS team included specialists in structural, fire, and forensic engineering. The following six individuals constituted the core group and are the authors of this report:

Paul F. Mlakar, Ph.D., P.E., Lead Technical Director; U.S. Army Corps of Engineers; Vicksburg, Mississippi; Specialty: blast-resistant design; investigator, Murrah Federal Office Building study
Donald O. Dusenberry, P.E.; Principal; Simpson Gumpertz & Heger, Inc.; Waltham, Massachusetts; Specialty: blast effects and structural design
James R. Harris, Ph.D., P.E.; Principal; J.R. Harris & Company; Denver, Colorado; Specialty: structural engineering
Gerald Haynes, P.E.; Fire Protection Engineer; Bureau of Alcohol, Tobacco, and Firearms; Washington, D.C.; Specialty: fire protection
Long T. Phan, Ph.D., P.E.; Research Structural Engineer; National Institute of Standards and Technology; Gaithersburg, Maryland; Specialty: concrete structural and fire engineering
Mete A. Sozen, Ph.D., S.E.; Kettelhut Distinguished Professor of Structural Engineering; Purdue University; Lafayette, Indiana; Specialty: behavior of reinforced-concrete structures

Many professional colleagues of these team members voluntarily contributed to the work of this team, in much the same way that the public assisted the victims of the disaster. These individuals are acknowledged in appendix A.W. Gene Corley, the BPS team leader for the World Trade Center Study, facilitated cooperation between the two study teams.

 

1.3 THE PENTAGON

The Pentagon is one of the largest office buildings in the world, encompassing about 6.6 million sq ft of floor space. Its name refers to the five sides of the building (figure 1.1), but the Pentagon is also five stories high and is subdivided into five circumferential rings. In the upper three stories, the rings are separated by light wells; the second well from the interior extends to the ground over most of its length and serves as an interior driveway. Ten radial corridors provide connection from ring to ring.

As the Pentagon approached its 50th anniversary in service, an extensive renovation was planned. (See “The Pentagon Project,” Civil Engineering, June 2001.) The actual construction began in 1999, and by September 11, 2001, one-fifth of the renovation was essentially complete. Structurally the renovation was not major;
the most significant changes were the addition of new elevators, stairs, escalators, and mechanical equipment rooms. Additionally, the exterior walls and windows were upgraded to provide a measure of resistance to extreme lateral pressures.

Figure 1.1 The Pentagon on September 5, 2001

 

1.4 THE CRASH

At 9:38 a.m. on September 11 an airliner was flown into the first story of the Pentagon. The impact occurred in the renovated portion of the building approximately 140 ft to the south of the boundary between the renovated section and the next section scheduled to be renovated. (Figure 1.2, a photograph taken by a security camera, shows the plane impacting the building at ground level.) The aircraft sliced through the building into the section not yet renovated. The impact and the fire initiated by the fuel in the airplane that immediately spread widely in the structure took the lives of all 64 people aboard the aircraft and 125 occupants of the Pentagon.

Figure 1.2 Aircraft impact

 

1.5 EXTENT OF DAMAGE

Figure 1.3 presents an exterior view of the extent of damage from the crash, including a collapsed portion of Ring E at the point of impact, beyond which the impact destruction from the decelerating aircraft continues; the subsequent devastation from the fire is also evident. The superior performance of the improved window system incorporated during the renovation is evident on the right.

Figure 1.3 Crash damage

 

1.6 SCOPE OF REPORT

Two issues of structural performance commanded attention in this study. First, the collapse that did occur was not immediate; this calls for an examination of the interaction between fire and structural performance. Second, many of the first-story columns in a portion of the structure that remained standing were destroyed during the crash. Such performance is desirable, and the reasons for it are of interest to the engineering profession.

Sections 2 through 6 of this report first detail the observations made directly by the team and review pertinent information from other sources that was significant in defining the performance. In section 7, approximate analyses of impact, structural, and fire behavior made by the team to illustrate the essential aspects of the performance are described. Sections 8 and 9 present findings and recommendations that are consistent with the purpose of the study.

(back to top)

 

2. REVIEW OF BUILDING INFORMATION

Volumes of information exist regarding the original construction of the Pentagon and its current renovation. The Pentagon Renovation Program Office assisted the BPS team in accessing the essential data for the purpose of this study.

 

2.1 DOCUMENTS FOR ORIGINAL CONSTRUCTION

Figure 2.1 is a plan view of the five-sided building at the upper three stories, emphasizing the light wells between the rings and the radial corridors. Figure 2.2 is a plan view at the first story, with the structural expansion joints added. Note that the light well between rings B and C extends to the ground over most of the circumference. It is known as AE Drive. For future reference, figure 2.2 also shows the area impacted by the crash and a few key grid lines.

The original drawings for the Pentagon subdivide the building into “sections”A through E and “areas” 1 through 10 (figure 2.3). The drawings referring to areas use the U.S. style of labeling stories— the ground level being called the first floor—whereas the drawings referring to sections use the European style, the level above the ground level being called the first floor. The radial corridors are numbered to correspond to the areas.

The Pentagon is in the midst of a major renovation program, and the work is phased in five “wedges” that do not correspond to either the sections or the areas. Each wedge is centered on a building vertex and consists of the portion of the building between the midpoint of adjacent sides. The renovation of Wedge 1 began in 1999 and was essentially complete at the time of the crash.

The original structural system, including the roof, was entirely cast-in-place reinforced concrete using normal-weight aggregate. Most of the structure used a specified concrete strength of 2,500 psi and intermediate-grade reinforcing steel (yield of 40,000 psi). The floors are constructed as a slab, beam, and girder system supported on columns, most of which are square. Figures 2.4 through 2.8 define the typical framing. Member sizes vary with framing arrangements and special loads. The area of interest in this study was populated by the typical members shown in the figures. The column sizes vary in each story—generally from
about 21 by 21 in. in the first story to 14 by 14 in. in the fifth story—but there are many exceptions. Nearly all the columns that support more than one level are spirally reinforced. The remaining columns have ties. The floor spans are relatively short by modern standards: 5.5 in. slabs span to 14 by 20 in. beams at 10 ft on center. The typical beam spans are 10 or 20 ft, with some at 15 ft. Girders measuring 14 by 26 in. span 20 ft parallel to the exterior walls and support a beam at midspan.

Figure 2.9 is a cross section transverse to the exterior wall. The roof at Ring E is gabled (as are those over Ring A and the radial corridors). Slabs 4.5 in. thick span perpendicular to the exterior wall with spans varying from about 8 to 11 ft. The slabs are supported by 12 by 16 in. purlins that span to rafter frames, which are 20 ft on center. The rafters are generally 16 by 24 in. and align with the floor beams and columns below. In general, the purlins do not align with the floor girders and columns below. The roof over rings B, C, and D consists of a nearly flat pan joist and slab system. The joist stems are 6 in. wide by 8 in. deep and the slab is 2.75 in. thick. The joists are 26 in. on center and span 20 ft. The roof over the corridors is 4.5 in. thick and spans 10 ft. The joists and slab are supported by 14 by 20 in. girders that are in line with the floor girders.

The perimeter exterior walls of Ring E are faced in limestone and backed with unreinforced brick infilled in the concrete frame. Nearly all remaining exterior walls are 10 in. concrete. The first story at AE Drive is brick infilled in the concrete frame, with no windows. The concrete walls have 5 by 7 ft openings for windows and include columns built in as pilasters, corresponding to column locations below, and girders reinforced within the wall. Figure 2.10 is an elevation at a typical light well wall. Slabs, beams, and girders all make use of straight and trussed bars. Except for the top reinforcement in the short spans adjacent to longer spans, there are no continuous top bars. However, approximately half of the bottom bars are made continuous by laps of 30 to 40 bar diameters at the supports. Beams and girders typically have open-topped stirrups. The longer spans generally have approximately equal areas of steel at the critical sections.

Any building is a product of its times. The Pentagon was constructed between September 1941 and January 1943. At that time the national standard predominantly used for reinforced-concrete buildings was ACI 501-36 as developed by the American Concrete Institute (ACI). Although no reference to ACI 501-36 was found in the drawings, it is very likely that this code affected decisions about member sizing and proportioning for the Pentagon structure. A brief review of some of its basic requirements is in order.

ACI 501-36 was based on working stress design. The allowable stress for the intermediate-grade billet steel used in the Pentagon was 20,000 psi. For the design concrete strength of 2,500 psi, the allowable unit shear stress for beams with properly designed web reinforcement was 150 psi. The unit bond stress for deformed bars was 125 psi for the same strength of concrete.

The axial load, P, permitted on reinforced-concrete columns with spiral reinforcement was defined by the expression

P/Ag = 0.225 f´c + ρg· fs

where
        Ag =gross cross-sectional area;
        f´c =compressive strength of concrete (6 x 12 in. cylinder);
        ρg = ratio of longitudinal reinforcement area to area of cross section;
        fs = permissible unit stress (16,000 psi for intermediate-grade steel).

This expression was conservative. The estimated service load of the column was set at approximately one-third of its expected strength on the basis of the specified compressive strength of the concrete and the specified yield stress of the reinforcement. At that time continuity in reinforced concrete was still difficult to handle analytically. Thus ACI 501-36 specified the following moment coefficients to be used in design.

Negative moment at face of first interior support: (1/10)wl2
Negative moment at face of interior supports: (1/12)wl2
Positive moment at center of exterior spans: (1/10)wl2
Positive moment at center of interior spans: (1/12)wl2

It is especially interesting to note that the interior-span positive and negative moments were to be of the same magnitude.

The physical characteristics of the Pentagon structure suggest that its design may have been influenced strongly by the book Reinforced Concrete Construction (Hool and Pulver 1937).This work describes a floor system quite similar to that depicted in figure 2.4. It is also of interest to note that this reference recommends a reinforcing arrangement similar to that in figure 2.7 for the girders. A critical attribute of the Pentagon structure was the continuity of at least half of the bottom reinforcement across the column line to lap for a distance of at least 30 bar diameters.

The columns were very important to the overall performance of the Pentagon; thus their original design was examined somewhat more closely. Table 2.1 shows that one of the most typical columns (type 14) apparently was designed to be economical by the original designers, because the margin of allowable capacity to demand was very close to unity in the lower stories. This computation ignores any bending moment from lateral loads, which at the time of the design were probably shown to be accommodated by the one-third increase in allowable stresses that was the fashion at the time. The live loads were reduced by 20 percent for columns supporting more than one floor, the common rule for storage loads.

Examination of the column design data leads to the conclusion that the minimum size used for columns was 14 in. square and that tied reinforcement was used until higher loads demanded a change. The first change was to spiral reinforcement, a 25 percent increase in allowable load by the standard of the day. The next change was in the size of the column. Given the nature of formwork at the time, today’s imperative of keeping column sizes constant was obviously not an issue.

Given the attention paid by the planners of the Pentagon renovation to the capacities of the existing structure, the BPS team did not study the lateral load capacity in much detail. A factor of note is that the seismic demands by current standards are less at the Pentagon site than the demands used in the planning studies. Given the higher material strengths found since those studies, as well as some very simple check analyses, the Pentagon structure would probably be evaluated as having a seismic capacity in line with guidelines for existing buildings.

 

2.2 DOCUMENTS FOR RENOVATION

Planning for the renovation of the Pentagon began in the late 1980s as the building was approaching 50 years in service. The planning and execution of the renovation led to the creation of three documents that are useful in understanding the structure and, by extension, its performance.

The July 1993 Structural Renovation Study, conducted by a joint venture of Daniel, Mann, Johnson, and Mendenhall and 3DI for the Army Corps of Engineers, Baltimore District, was commissioned as part of the overall evaluation of the questions concerning the merit and the details of renovating the Pentagon. The report addressed the load capacity, the general condition, and the seismic resistance. The stated purpose was to examine the structural implications of new stairs, elevators, escalators, and duct shafts; the removal of steep floor-to-floor ramps; the creation of large, multistory spaces for an auditorium and multipurpose rooms; and the addition of more mezzanine space in the basement.

The general condition of the concrete structure was found to be good.

This study was completed before testing of materials had been completed, and there was uncertainty about the strength of the reinforcing steel. Many of the calculations, performed in 1991 and 1992, assumed structural grade rebar, fy = 33 ksi. Before the report was issued, it had been concluded that intermediate grade
(fy = 40 ksi) was more appropriate. Concrete strength was assumed to have been the specified 2,500 psi. The report stated that some pile load tests had been performed in the early 1970s, and those tests showed an allowable capacity nearly twice the 30 tons per pile required on the original drawings.

The floor live-load capacity was confirmed at 150 psf, with no reductions based upon area. This corroborated the June 25, 1944, report, Pentagon Project, which indicated that this live load was used because it was anticipated that the building would be used for record storage following the war. Capacities of typical members
were checked using the 1989 edition of ACI 318, Standard Building Code for Reinforced Concrete; a few comparisons with the 1941 edition were made to see if there was anything about the original design that was not conservative in comparison with current standards. Reference is made to another report, Pentagon Renovation Program Standards and Criteria, for loads to use in the design for the renovation.

The Structural Renovation Study included a brief examination of the lateral-load-resisting system of the building. Although the report concluded that the military design manuals did not require a seismic evaluation and upgrade, seismic loads dominated this examination. A typical frame in the radial direction was evaluated using 80 percent of the seismic loading required for new buildings, which was the standard method at the time. Three different standards for new buildings were considered: one based upon the 1975 edition of the Structural Engineers Association of California (SEAOC) Blue Book, a second upon the 1990 edition of the
same document, and a third upon the 1990 edition of the Building Officials and Code Administrators’ (BOCA) National Building Code. A fourth analysis for wind load from the 1992 supplement to the BOCA code was also performed. The loading was largest in the first method cited and decreased successively in each of the others.

The basic finding was that the capacity of all columns except the fifth-story columns exceeded the demands of the required load, while the capacity of the beams was slightly less than the demand for the largest of the loads. The computations were performed using 33 ksi for the yield strength of the reinforcing; substituting 40 ksi shows that these capacities would be adequate.

From the analysis it was also found that the larger loads would cause pounding of adjacent structures at the expansion joints. It was postulated that shear walls or braces would be required to resolve the deficiencies and that the natural concentration of forces resulting from such strengthening would inevitably overload the foundations, which would then also require additional capacity. Concern was also expressed about the lack of full-length top reinforcement in the beams and girders. The conclusion was that seismic upgrading was not necessary, primarily because of the low hazard for strong ground motions.

On the whole this study clearly indicates that the reinforced-concrete structure was competently designed and built for heavy loads, was showing very little distress, and could be relied upon for continued good and safe service.

The March 1998 Renovation of the Pentagon: Basis of Design: Ready-to-Advertise Submission: Wedge 1, produced by Hayes, Seay, Mattern & Mattern for the Army Corps of Engineers, Baltimore District, describes the criteria used for the design of the renovation, focusing on Wedge 1 of the Pentagon. The scope of the structural work (in all wedges) includes the construction of 17 new threestory mechanical rooms to be built in portions of the existing light wells; the installation of several new elevators, escalators, and duct shafts; the replacement of interfloor ramps with level floors; the construction of new utility tunnels and the renovation of others; some construction over AE Drive; the inclusion of new doors in the light wells; the closure of some existing floor openings; and the installation of new full-height stairs.

The structural design criteria, in general, were those contained in the current editions of familiar standards for the design of concrete, steel, and masonry structures. The live loads were generally those required by the standard ASCE 7, Minimum Design Loads for Buildings and Other Structures (1993 edition), with the exception of
general office areas, which were to be designed for an 80 psf live load plus a 20 psf allowance for partitions. Wind and snow loads were also to be as specified in ASCE 7, and seismic loads were as defined in military Technical Manual 5-809-10, which is an application of the SEAOC Blue Book—hence it would be very similar to the 1994 Uniform Building Code.

The new construction consisted primarily of either filling in existing voids in the original construction or creating framing around new openings. This new work mainly entailed concrete slabs on composite steel deck and beams. Where the loads exceeded the capacity of the existing concrete columns, new steel columns and foundations were provided.

The structural class for fire resistance was type 1B (protected, noncombustible) as defined in the BOCA National Building Code. The original concrete structure inherently possessed such ratings and the new steel beams and columns achieved the protection with sprayed-on insulation (generally two-hour rating for floors and members supporting only one level and three-hour rating for members supporting more than one level).

As described previously, the original exterior Ring E wall is mostly non-load-bearing masonry infilled in a concrete frame. The exterior surface is 5 in. thick limestone, which covers the frame, backed by 8 in. unreinforced brick that is infilled in the frame. In some areas the backing is a cast-in-place concrete wall. At the locations inspected for this study, the brick infill at the fifth story was not in contact with the columns, but was separated by a 2 in. gap crossed by metal ties between the mortar joints and dovetail slots in the column face. (According to consultation with an engineer from the authoring firm, at other locations the brick was mortared tight to the columns.) Concrete columns exist at 20 ft on center in the fifth story and at 10 ft on center in the lower stories. The fifth story has no windows, and the brick is interrupted by a concrete beam between the fifth floor and the eave of the roof. The remaining stories have 5 by 7 ft windows in the majority of the 10 ft bays, and the head of the window is the soffit of the concrete edge beam of the floor above.

(back to top)

 

3. REVIEW OF CRASH INFORMATION

The volume of information concerning the aircraft crash into the Pentagon on September 11 is rather limited. Through the cooperation of transportation, law enforcement, and news organizations the BPS team was able to collect the essential data for the purpose of this study.

 

3.1 AIRCRAFT DATA

The impacting airplane was a Boeing 757-200 aircraft, originally delivered in 1991. This aircraft was designed to accommodate approximately 200 passengers and 1,670 cu ft of cargo. The wingspan, overall length, and tail height (see figure 3.1) were respectively 124 ft 10 in., 155 ft 3 in., and 44 ft 6 in. Maximum takeoff weight was 255,000 lb, including up to 11,275 gal of fuel. Much of the aircraft fuel was contained in wing tanks. The aircraft was designed to cruise up to 3,900 nautical miles at a speed of Mach 0.80 (approximately 890 ft/s). The two engines were manufactured by Rolls-Royce and had 44,000 lb of combined thrust.

Figure 3.1 Dimensions of Boeing 757-200 aircraft

 

When the aircraft departed from Washington’s Dulles International Airport on the morning of September 11, 2001, it held 64 persons—passengers and crew members—and enough fuel for the cross-country trip to Los Angeles. According to the National Transportation Safety Board, the aircraft weighed approximately 181,520 lb and was traveling at 460 knots (780 ft/s) on a magnetic bearing of 70 degrees when it struck the Pentagon. The aircraft had on board approximately 36,200 lb (5,300 gal) of fuel at the time of impact.

According to Boeing engineers, the weight in each wing was composed of the following:

Exposed wing structure: 13,500 lb
Engine and struts: 11,900 lb
Landing gear: 3,800 lb
Fuel: 14,600 lb
Total: 43,800 lb

The balance of the weight was in the fuselage. In the normal course of use the center fuel tank is the last filled and the first used. Thus the weight of the fuselage at the time of impact was 181,520 – (2 x 43,800) = 93,920 lb. Of this, 36,200 – (2 x 14,600) = 7,000 lb was fuel in the center tank.

 

3.2 EYEWITNESS INTERVIEWS

On January 8, 2002, BPS team leader Paul Mlakar interviewed three eyewitnesses—two of whom witnessed the impact of the aircraft and one of whom witnessed the subsequent partial collapse of the building. All three are professional staff members of the Pentagon Renovation Program Office and collectively provide a coherent and credible account of the events.

Frank Probst, 58, is a West Point graduate, decorated Vietnam veteran, and retired army lieutenant colonel who has worked for the Pentagon Renovation Program Office on information management and telecommunications since 1995. At approximately 9:30 A.M. on September 11 he left the Wedge 1 construction site trailer, where he had been watching live television coverage of the second plane strike into the World Trade Center towers. He began walking to the Modular Office Compound, which is located beyond the extreme north end of the Pentagon North Parking Lot, for a meeting at 10 A.M. As he approached the heliport (figure 3.2) he noticed a plane flying low over the Annex and heading right for him. According to the Arlington County after-action report (Arlington County, 2002), this occurred at 9:38 a.m. The aircraft pulled up, seemingly aiming for the first floor of the building, and leveled off. Probst hit the ground and observed the right wing tip pass through the portable 750 kW generator that provides backup power to Wedge 1. The right engine took out the chainlink fence and posts surrounding the generator. The left engine struck an external steam vault before the fuselage entered the building. As the fireball from the crash moved toward him, Probst ran toward the South Parking Lot and recalls falling down twice. Fine pieces of wing debris floated down about him. The diesel fuel for the portable generator ignited while he was running. He noted only fire and smoke within the building at the point of impact. Security personnel herded him and others to the south, and he did not witness the subsequent partial collapse of the building.

Figure 3.2 Pentagon and approaching aircraft, viewed from the southwest

 

Don Mason, 62, is a communications specialist who retired from the United States Air Force after 25 years of service. He has worked for the Pentagon Renovation Program Office on information management and telecommunications since 1996. At the time of the crash he was stopped in traffic west of the building. The plane approached low, flying directly over him and possibly clipping the antenna of the vehicle immediately behind him, and struck three light poles between him and the building. He saw his colleague Frank Probst directly in the plane’s path, and he witnessed a small explosion as the portable generator was struck by the right wing. The aircraft struck the building between the heliport fire station and the generator, its left wing slightly lower than its right wing. As the plane entered the building, he recalled seeing the tail of the plane. The fireball that erupted upon the plane’s impact rose above the structure. Mason then noticed flames coming from the windows to the left of the point of impact and observed small pieces of the facade falling to the ground. Law enforcement personnel moved Mason’s vehicle and other traffic on, and he did not witness the subsequent partial collapse of the building.

Rich Fitzharris, 52, is an electrical engineer and a former residential contractor. He has been the operations group chief of the Pentagon Renovation Program Office since 1996. He was in the Modular Office Compound at the time of the crash and rushed to the site on foot, arriving before the partial collapse. He recalls that the building—near the area of impact—was in flames, and he remembers seeing small pieces of debris, the largest of which might have been part of an engine shroud. He was at the heliport when a portion of the structure collapsed. The collapse initiated at the fifth floor along the building expansion joint, proceeded continuously and was completed within a few seconds. According to the Arlington County after-action report, this occurred at 9:57 a.m., or 19 minutes after impact.

 

3.3 SECURITY CAMERA PHOTOGRAPHS

A Pentagon security camera located near the northwest corner of the building recorded the aircraft as it approached the building. Five photographs (figures 3.3 through 3.7), taken approximately one second apart, show the approaching aircraft and the ensuing fireball associated with the initial impact. The first photograph (figure 3.3) captured an image of the aircraft when it was approximately 320 ft (approximately 0.42 second) from impact with the west wall of the Pentagon. Two photographs (figures 3.3 and 3.7), when compared, seem to show that the top of the fuselage of the aircraft was no more than approximately 20 ft above the ground when the first photograph of this series was taken.

 

 Figure 3.3 Aircraft approaching the Pentagon

 

 Figure 3.4 Fireball within one second of impact (note security building in silhouette)

 

 

 Figure 3.5 Fireball within two seconds of impact

 

 

 Figure 3.6 Fireball within three seconds of impact

 

Figure 3.7 Fireball within four seconds of impact; the shadow of the smoke cloud visible on the ground provides a reference for determining the height of the aircraft.

 

 

3.4 PRECOLLAPSE PHOTOGRAPHS

A photograph (figure 3.8) taken by the Associated Press before the building to the south of the expansion joint collapsed provides useful information that the BPS team could not observe at the site. This photograph shows that the portion of the building that subsequently collapsed was displaced vertically by approximately 18 in. to 2 ft relative to the building north of the expansion joint. The facade was missing on the first floor as far north as column line 8 (the expansion joint is at column line 11), and on the second floor, the facade was missing between column lines 11 and 15. However, windows and their reinforcing frames were still in place between column lines 11 and 13 on the second floor.

Figure 3.8 Northern portion of impact area before collapse

 

The photograph also shows that the only column missing on the second floor in the west exterior wall of the building was at column line 14. The spandrel beam for the third floor and all third-floor exterior columns appears to be intact.

The photograph shows that blast-resistant glass installed as part of the Pentagon renovation was not broken by the impact or the fireball, even where the windows were located as close as 10 ft to the impact point of the fuselage.

A second photograph (figure 3.9) taken before the collapse reveals that first-floor exterior columns on column lines 15, 16, and 17 were severely distorted but still attached at least at their top ends to the second-floor framing. The vertical displacement noted previously also is evident in this photograph.

Figure 3.9 Southern portion of impact area before collapse

 

The precollapse state of the structure is illustrated for clarity in figure 3.10.

Figure 3.10 Impact location before collapse

 

3.5 PHOTOGRAPH TAKEN DURING COLLAPSE

Figure 3.11 is a photograph taken at the moment of collapse, approximately 20 minutes after the aircraft struck the west wall of the Pentagon. The collapse extended to approximately column line 18 on the west face of the building.

Figure 3.11 Portion of Ring E at moment of collapse

 

3.6 POSTCOLLAPSE PHOTOGRAPH

Figure 3.12—a photograph taken after the fire was extinguished, but before significant debris was removed from the collapse area or shoring was installed—shows the condition of the building after the collapse. The collapsed portion of Ring E extends from an expansion joint on column line 11 to approximately column line 18 on the west facade.

Figure 3.12 Ring E after collapse

 

The limestone facade and brick dislodged from the framing, revealing the steel supports that had been added during the renovation. Window panes were generally still in place in windows in the area that collapsed. Scars from debris impact are visible to the south of the collapse area, as high on the facade as the tops of the fourth-floor windows.

 

3.7 SUMMARY OF THE IMPACT

The Boeing 757 approached the west wall of the Pentagon from the southwest at approximately 780 ft/s. As it approached the Pentagon site it was so low to the ground that it reportedly clipped an antenna on a vehicle on an adjacent road and severed light posts. When it was approximately 320 ft from the west wall of the building (0.42 second before impact), it was flying nearly level, only a few feet above the ground (figures 3.2 and 3.13, the latter an aerial photograph modified graphically to show the approaching aircraft). The aircraft flew over the grassy area next to the Pentagon until its right wing struck a piece of construction equipment that was approximately 100 to 110 ft from the face of the building (0.10 second before impact (figure 3.14). At that time the aircraft had rolled slightly to the left, its right wing elevated. After the plane had traveled approximately another 75 ft, the left engine struck the ground at nearly the same instant that the nose of the aircraft struck the west wall of the Pentagon (figure 3.15). Impact of the fuselage was at column line 14, at or slightly below the second floor slab. The left wing passed below the second-floor slab, and the right wing crossed at a shallow angle from below the second floor slab to above the second-floor slab (figure 3.16)

Figure 3.13 Aerial photograph modified to show approaching aircraft

Figure 3.14 Aircraft at impact with generator

Figure 3.15 Aircraft at impact with vent structure

Figure 3.16 Aircraft at impact with the Pentagon

 

A large fireball engulfed the exterior of the building in the impact area. Interior fires began immediately.

The impact upon the west facade removed first-floor columns from column lines 10 to 14. First-floor exterior columns on column lines 9, 15, 16, and 17 were severely damaged, perhaps to the point of losing all capacity. The second-floor exterior column on column line 14 and its adjacent spandrel beams were destroyed or seriously damaged. Additionally, there was facade damage on both sides of the impact area, including damage as high as the fourth floor. However, in the area of the impact of the fuselage and the tail, severe impact damage did not extend above the third-floor slab.

Immediately upon impact, the Ring E structure deflected downward over the region from an expansion joint on column line 11 south to the west exterior column on column line 18 (figures 3.8–3.10).The deformation was the most severe at the expansion joint, where the deflection was approximately 18 in. to 2 ft.

The structure was able to maintain this deformed shape for approximately 20 minutes, at which point all five levels of Ring E collapsed from column line 11 to approximately column line 18 (figure 3.12).

 

3.8 FATALITY INFORMATION

Data provided by the Federal Bureau of Investigation included the locations where fatalities were found in the building. This information is reproduced as figures 3.17 and 3.18. No fatalities from the aircraft were found on the second floor (figure 3.18).The figure shows no fatalities in the collapsed area above the first floor. In fact, it is likely that there were upperfloor fatalities in this area, but their remains were found on the first-floor level after the building collapsed. The Army Medical Command examined the recovered remains to determine the causes of death. Approximately one-third of the fatalities were related to the impact, one-third to the fire, and one-third to a combination of impact and fire.

Figure 3.17 Fatalities found in first story

Figure 3.18 Fatalities found in second story

(back to top)

 

4. REVIEW OF OTHER STUDIES

Studies of the Pentagon crash have been or are being conducted by entities other than the BPS team. A number of these entities have shared information relevant to the goal of the building performance study. This information is described in 4.1–4.4.

 

4.1 RENOVATION ENGINEER

Following the events of September 11 the Pentagon Renovation Program initiated a building performance evaluation under the direction of the chief engineer, Georgine K. Glatz. The objective is, through building assessments and interviews with survivors, to learn how to maximize survival rates in similar events. The evaluation addresses fire suppression and rescue activities; building operations; human factors; and structural, architectural, fire-protection, mechanical, electrical, information management, and telecommunications systems. Dr. Glatz met with the BPS team on January 9, 2002, and with the team leader on a number of other occasions. The work of her task force to a great extent underlies the structural analyses set forth here and in section 7 and helps to explain the structural system within the context of the Pentagon’s unique form and function.

 

4.2 RECONSTRUCTION ENGINEER

Immediately following the September 11 crash the Pentagon Renovation Program Office contracted with K.C.E. Structural Engineers, P.C., to oversee the recovery, demolition, and reconstruction of the site. As part of this effort, the principal, Allyn E. Kilsheimer, P.E., ordered materials tests on the concrete and the reinforcing steel. Two sets of cores were extracted for compressive stresses. In addition, numerous petrographic samples were taken and examined. Concrete testing and petrographic analyses were performed by ECS, Ltd., of Chantilly, Virginia, and reinforcing steel was tested by Arctech Testing, L.L.C., also of Chantilly, Virginia. The materials tests and examination data described below were provided to the BPS team for its use.

On October 2, 2001, the first set of six concrete cores was taken from beams along the west exterior wall in the debris of the collapsed area. Cores had nominal diameters of 3 in. and length-to-diameter ratios ranging from 1.73 to 2.09. When tested dry in accordance with American Society for Testing and Materials Standard C-42-99, corrected compressive strengths ranged from 4,420 to 5,310 psi. The mean and standard deviation for the tested compressive strengths were respectively 5,070 and 369 psi.

On October 29, 2001, 10 additional 3 in. diameter concrete cores were taken from an area to the north of the impact area, where the fire was severe. The purpose for testing these cores was to assist in the decision about how much of the building could be restored. These samples had length-to-diameter ratios ranging from 1.27 to 2.01, and corrected compressive strengths in this set of tests ranged from 2,180 to 4,210 psi. The mean and standard deviation for the tested compressive strengths were respectively 3,550 and 672 psi.

The test results for the two sets of cores differed substantially, both in the magnitudes of the average strengths and in the variability of results within each set. It is possible that these variations resulted from differences in mixing practices used at the several concrete batch plants that were established on the site when the Pentagon was originally constructed. It is also possible that the strength variations are the result of differences in exposures to heat during the fire that followed the impact of the aircraft.

According to ECS, Ltd., samples for petrographic evaluation were taken from the northern end of the fire-damaged area. Many of the samples exhibited symptoms of fire damage during petrographic examinations. The overall concrete quality was classified as fair to good, with approximately 13/16 in. carbonation. ECS, Ltd., determined that the concrete was placed originally with high slump.

Arctech Testing tested five samples of reinforcing steel. The results of their tests are summarized in table 4.1.

According to Arctech Testing, sample 1 passed all tensile strength requirements in table 2 of American Society for Testing and Materials (ASTM) Standard A615 for grade 60; samples 2 and 5 passed all tensile strength requirements in table 2 of ASTM A615 for grade 40 (and would also for the former grade 50); and samples 3 and 4 met the yield and tensile strength requirements in table 2 of ASTM A615 for grade 40.

KCE informed the Pentagon BPS team that actual construction deviated from construction documents in many locations.

 

4.3 CORPS OF ENGINEERS STUDY

With the cooperation of the Army Corps of Engineers the team reviewed studies that focused on protecting Pentagon occupants and ensuring mission continuity in the wake of the September 11 crash.

The windows demonstrated desirable energy absorption in their response to the blast and also withstood the impact of debris fragments. The steel framework supporting these windows responded with strength and ductility, as intended in its design.

The report further noted that the reinforced-concrete frame of the building is inherently robust. This stems from the closely spaced spiral reinforcement in the columns in the lower stories. Additionally, much of the beam and girder flexural reinforcement continued through the support connection. The robustness was demonstrated in the resistance to progressive collapse following the crash.

 

4.4 URBAN SEARCH AND RESCUE ENGINEERS

Approximately a dozen professional structural engineers participated on-site in the initial rescue and recovery operations between September 11 and September 21. While their focus was on emergency search and rescue, they observed the initial structural condition of the building. Their photographs and other documentation proved valuable in understanding the condition of the building.

(back to top)

 

5. BPS SITE INSPECTIONS

Members of the BPS team inspected the site on two occasions. Between September 14 and September 21, 2001, team leader Paul Mlakar had limited access to the site while rescue and recovery operations were still in progress. On this early inspection visit, he examined the exterior of the building and portions of the building interior.

Controlled access to the site was granted to the full team after rescue and recovery operations were complete. On October 4, 2001, the Pentagon team, together with John Durrant, the executive director of ASCE’s institutes, and W. Gene Corley, the BPS team leader at the World Trade Center, inspected the interior and exterior of the damaged area of the Pentagon for approximately four hours.

The inspection of the BPS team focused on obvious physical damage, primarily in the region of the impact. This inspection was not comprehensive. It did not address fire damage to concrete as a material, and it did not result in full documentation of all physical damage or as-built construction.

By the time the full Pentagon BPS team visited the site, all debris from the aircraft and structural collapse had been removed (figure 5.1) and shoring was in place wherever there was severe structural damage. The design team charged with reconstructing the Pentagon was assessing the building and preparations were being made to demolish the areas for reconstruction. Consequently, the Pentagon BPS team never had direct access to the structural debris as it existed immediately after the aircraft impact and subsequent fire.

Figure 5.1 Impact area with debris removed

 

Following a brief period of orientation, the Pentagon BPS team members paired off into four separate inspection teams to survey different portions of the damaged area of the building. Three inspection teams documented conditions in the first story, and the fourth team documented the upper stories.

For the purposes of the inspection, damage to individual structural elements was classified as follows:

• No significant damage;
• Cracking and spalling, but no significant impairment in function;
• Heavy cracking and spalling, with some impairment in function (the member remaining straight or nearly so);
• Large deformation, with significant impairment in function;
• Members missing, broken, disconnected, or otherwise without remaining function.

The teams attempted to inspect and photograph all columns with significant visible damage and most of the beams and floor bays with significant visible damage. To the extent possible, it was noted whether physical loads or the effects of fire caused the observed damage. The BPS team also noted the performance of windows and exterior wall reinforcements that had been installed to enhance blast resistance in Wedge 1 prior to the attack. However the BPS team inspections were not comprehensive, and they did not address fire-related material degradation.

The collapsed portion of Ring E was immediately south of an expansion joint on column line 11 (figures 5.2 and 5.3). The collapsed area extended south from the expansion joint to approximately column line 15 on the east side of Ring E and to approximately column line 18 on the west side of Ring E (figure 5.4). No portion of Ring D or Ring C collapsed; nor did either of the two-story sections between the rings.

Figure 5.2 Beams and columns on north side of expansion joint

Figure 5.3 Aerial view of collapsed portion of Ring E

Figure 5.4 Remaining structure at southern extreme of collapse area

 

Since all debris was removed prior to the detailed inspection, the team was unable to determine specifically the level and extent of impact damage in this region of the building.

In general, the first-floor interior columns were severely damaged immediately adjacent to the collapse area on the north side of the expansion joint on column line 11 in Ring E. First-floor columns 11A, 11B, and 11C to the north of the expansion joint were missing (figure 5.5). Upper columns on the north side of the expansion joint on column line 11 were intact, except for the second-floor columns at 11A and 11B. These columns were severed at the second floor, which was also damaged at this location.

Figure 5.5 Missing first-floor columns 11A, 11B, and 11C

 

None of the facade in the collapse area was accessible for inspection. However, the team did observe that limestone of the first-floor facade was seriously damaged
to the north to column line 8 (figure 5.6). Some first-floor limestone panels of the facade were missing for an additional 30 to 50 ft to the north (figure 5.7). The first-floor exterior column on column line 9 remained in place, but the rest of the exterior columns south to column line 11, at the start of the collapsed area, were gone.

Figure 5.6 Facade damage to the north of the impact area

Figure 5.7 First-floor facade damage to the north of the impact area

 

To the south, facade panels on both the first and second floors between column lines 18 and 20 were severely damaged (figure 5.8).

Figure 5.8 Facade damage to the south of the impact area

 

The exterior of the building showed clear evidence of the extensive fire that occurred within the building. The limestone facade was blackened by smoke for more than 200 ft to the north of the impact point (figure 5.9). Evidence of fire damage was less severe to the south (figure 5.10), and even immediately adjacent to the impact area the facade to the south showed little evidence of fire damage.

Figure 5.9 Exterior evidence of fire to the north of the impact area

Figure 5.10 Exterior evidence of fire to the south of the impact area

 

The west facade of the Pentagon was severely scarred by debris impact, particularly to the south of the collapse area (figure 5.11). Just above the second-floor slab, the exterior columns on column lines 18 and 19 exhibited aligning gashes that seem to indicate impact by the right wing of the aircraft (figure 5.12). An area of broken limestone of the facade over the exterior column on column line 20 also aligned with these gashes. The fire station to the north of the heliport and the impact area was also damaged by flying debris (figure 5.13).

Figure 5.11 Debris scars at upper levels south of impact area

Figure 5.12 Gashes from impact of right wing

Figure 5.13 Damage to fire station

 

The team observed that the upgraded window system was generally still in place within the reinforced frames (figure 5.14). Windows that had not been upgraded generally were broken for several hundred feet to the north of the impact point (figure 5.15).

The aircraft had entered the building at an angle, traveling in a northeasterly direction. With the possible exception of the immediate vicinity of the fuselage’s entry point at column line 14, essentially all interior impact damage was inflicted in the first story: The aircraft seems for the most part to have slipped between the first-floor slab on grade and the second floor. The path of damage extended from the west exterior wall of the building in a northeasterly direction completely through Ring E, Ring D, Ring C, and their connecting lower floors. There was a hole in the east wall of Ring C, emerging into AE Drive, between column lines 5 and 7 in Wedge 2 (figure 5.16). The wall failure was approximately 310 ft from where the fuselage of the aircraft entered the west wall of the building. The path of the aircraft debris passed approximately 225 ft diagonally through Wedge 1 and approximately 85 ft diagonally through a portion of Ring C in Wedge 2.

Figure 5.16 Hole to AE Drive

 

Columns and beams along the path of the debris and within the fire area were damaged to varying degrees. Some columns and beams were missing entirely (figure 5.17), while others nearby sometimes appeared unscathed.

Most of the serious structural damage was within a swath that was approximately 75 to 80 ft wide and extended approximately 230 ft into the first floor of the building. This swath was oriented at approximately 35 to 40 degrees to the perpendicular to the exterior wall of the Pentagon. Within the swath of serious damage was a narrower, tapering area that contained most of the very severe structural damage. This tapering area approximated a triangle in plan and had a width of approximately 90 ft at the aircraft’s entry point and a length of approximately 230 ft along the trajectory of the aircraft through the building.

Severe damage included heavy cracking and spalling, either from impact or from the ensuing fire. The concrete cover had been completely dislodged from the spirally reinforced core concrete and steel of the most heavily damaged columns that remained in place. Figure 5.18 shows a column at the edge of the collapse area that appears to have been stripped of most of its cover by impact. Figure 5.19 shows a column with impact damage and relatively severe fire damage.

Several columns were substantially distorted, exhibiting lateral displacement at the column mid-height equal to at least three times the diameter of the spiral cage. Some highly distorted columns were bent in uniform curvature with discrete hinges at each end (figure 5.20), while others were bent into triple curvature (figure 5.21). In these cases, the vertical column steel remained attached to the foundation below and the second-floor beams above (figure 5.22). The deformed shapes of the columns with this damage were smooth curves: generally they did not have discrete deformation cusps.

In the worst cases, first-floor columns were severed from the second floor above or from the slab on grade or were missing entirely. Severed columns generally were lying on the slab on grade, still attached to the floor (figure 5.23). These columns were straight (except for the discrete bends at the connections to the floor) in their prone positions.

The orientations of the distorted columns and the columns that were severed all indicated a common direction for the loads that caused the damage. The direction of column distortion consistently formed an angle of approximately 42 degrees with the normal to the west exterior wall of the Pentagon.

Most first-floor columns outside of the direct path of the moving debris had no visible damage or had light cracking and spalling (figure 5.24), most probably caused by fire.

There were two primary areas where beams and slabs of the second floor were damaged by impact: (1) in an area bounded approximately by column lines A, 5, B, and 11 (figure 5.25) and (2) in an area bounded approximately by column lines E, 5, H, and 7 (figure 5.26). The most severe damage was in the second of these
areas, where the second-floor slab was breached and pushed upward approximately 18 in. (figure 5.27). In other panels in these regions, slab cracks were relatively closely spaced (6 to 8 in. apart) in ring and radial patterns (figure 5.28). Some floor beams were completely stripped from the underside of the slab above (figure
5.29). In addition, second-floor beams framing air shafts to the low roof between Ring C and Ring D were severely damaged (figure 5.30).

Damage to the structure above the second floor (outside the collapse area) appeared to be related to fire (figure 5.31) rather than impact, even though the orientation of the region of severe damage aligned generally with severe damage below the second-floor slab. Fire damage in the second story appeared most severe around the region of collapse and near the breach in the second-floor slab.

Generally, the most obvious fire damage was between the fire walls to the north and south of the area directly damaged by the aircraft debris. The most severe fire damage occurred on the first and second floors. The team noted no impact damage above the second story.

Appendix B includes a summary of damage and a photograph of each first-story column in the area of impact damage.

(back to top)

 

6. DISCUSSION

6.1 IMPACT DAMAGE

The site data indicate that the aircraft fuselage impacted the building at column line 14 at an angle of approximately 42 degrees to the normal to the face of the building, at or slightly below the second-story slab. Eyewitness accounts and photographs taken by a security camera suggest that the aircraft was flying on nearly a level path essentially at grade level for several hundred feet immediately prior to impact. Gashes in the facade above the second-floor slab between column lines 18 and 20 to the south of the collapse area suggest that the aircraft had rolled slightly to the left as it entered the building. The right wing was below the second-floor slab at the fuselage but above the second-floor slab at the tip, and the left wing struck the building entirely below the second-floor slab, to the north of column line 14.

The width of the severe damage to the west facade of the Pentagon was approximately 120 ft (from column lines 8 to 20). The projected width, perpendicular to the path of the aircraft, was approximately 90 ft, which is substantially less than the 125 ft wingspan of the aircraft (figure 6.1). An examination of the area encompassed by extending the line of travel of the aircraft to the face of the building shows that there are no discrete marks on the building corresponding to the positions of the outer third of the right wing. The size and position of the actual opening in the facade of the building (from column line 8 to column line 18) indicate that no portion of the outer two-thirds of the right wing and no portion of the outer one-third of the left wing actually entered the building.

Figure 6.1 Aircraft aligned with damage on west facade

 

It is possible that less of the right wing than the left wing entered the building because the right wing struck the facade crossing the level of the second-floor slab. The strength of the second- floor slab in its own plane would have severed the right wing approximately at the location of the right engine. The left wing did not encounter a slab, so it penetrated more easily.

In any event, the evidence suggests that the tips of both wings did not make direct contact with the facade of the building and that portions of the wings might have been separated from the fuselage before the aircraft struck the building. This is consistent with eyewitness statements that the right wing struck a large generator before the aircraft struck the building and that the left engine struck a ground-level, external vent structure. It is possible that these impacts, which occurred not more than 100 ft before the nose of the aircraft struck the building, may have damaged the wings and caused debris to strike the Pentagon facade and the heliport control building.

The wing fuel tanks are located primarily within the inner half of the wings. The center of gravity of these tanks is approximately one-third of the wing length from the fuselage. Considering this tank position and the physical evidence of the length of each wing that could not have entered the building, it appears likely that not more than half of the fuel in the right wing could have entered the building. While the full volume of the left wing tank was within the portion of the wing that might have entered the building, some of the fuel from all tanks rebounded upon impact and contributed to the fireball. Only a portion of the fuel from the left and right wing tanks and the center fuselage tank actually entered the building.

The height of the damage to the facade of the building was much less than the height of the aircraft’s tail. At approximately 45 ft, the tail height was nearly as tall as the first four floors of the building. Obvious visible damage extended only over the lowest two floors, to approximately 25 ft above grade.

Damage to the first-floor columns is summarized in figures 6.2 and 6.3. In formulating opinions about columns in the collapse area, the BPS team interpreted photographs taken after impact and before collapse.

Figure 6.2 Damage to columns in first story viewed along path of aircraft

Figure 6.3 Damage to columns in first story viewed across path of aircraft

 

The team members do not have direct information on the impact damage to the upper floors in the collapsed portion of the building. However, based on observations of the condition of the adjoining structure and the photographs of the building before the collapse, the following general observations may be made:

Impact damage on the first floor was extensive near the entry point of the aircraft. It is likely that the exterior first-floor columns from column line 10 to column line 14 were removed entirely by the impact and that the exterior columns on column lines 9, 15, 16, and 17 were severely damaged. Most probably, many or most of the first-floor interior columns in the collapse area were heavily damaged by impact.

The removal of the second-floor exterior column on column line 14, probably by the fuselage tail, suggests that the second-floor slab in this area was also severely damaged even before the building collapsed. In the portion of the building that remained standing to the north of the expansion joint, the slab and second-floor columns at column lines A, B, and C were heavily damaged. This condition, which is consistent with the trajectory of the aircraft, suggests that the second-floor slab from the expansion joint on column line 11 south to the fuselage entry point on column line 14—including columns 11B, 11C, and 13A on the second floor—was heavily damaged, perhaps destroyed.

It is difficult to judge the condition of other columns on the second floor in the collapse area. However, more likely than not column 15A was relatively undamaged. It is unlikely that columns above the second floor sustained impact damage, even in the area that ultimately collapsed.

Figure 6.4 summarizes the damage to the second-floor beams. (Lightly damaged beams were numerous, but they are not shown in this figure because the BPS team was not able to complete a comprehensive survey during its inspections.) Figure 6.5 summarizes breaches in the second-floor slab and damage to columns that supported the third floor.

Impact damage to the structure above the second-floor slab did not extend more than approximately 50 ft into the building. This shows that the aircraft slid between the first-floor slab on grade and the second-floor slab for most of its distance of travel after striking the building.

Along the path of the movement of aircraft debris through the building, the most severe damage was confined to a region that can be represented approximately by a triangle centered on the trajectory of the aircraft in plan, with a base width at the aircraft entry point of approximately 90 ft and a length along the aircraft path of approximately 230 ft (figure 6.6). However, within this triangular damage area there were a few relatively lightly damaged columns interspersed with heavily damaged columns along the path of the aircraft debris through the building. Column 1K (figure 6.6), located 200 ft from the impact point, was the last severed column along the path of the aircraft. Note that columns on grids E and K are much weaker than the other columns because they support only one floor and a roof.

Figure 6.6 Damage regions in first story

 

There were two areas of severe impact damage in the first story. The first area along the path of the aircraft was within approximately 60 ft of the impact point and corresponds generally to the area that collapsed. In the collapse area and for approximately 20 ft beyond the collapse area along its northern and eastern edges, columns were removed or very severely damaged by impact. In addition, there was serious second-floor beam and slab damage for 60 ft to the north of the collapse area, especially along a strip bounded approximately by column lines B and C.

The second area of severe damage was bounded approximately by column lines E, 5,G, and 9. In this region, which was beyond a field of columns that remained standing, several columns were severed and there was significant second-floor beam and slab damage. In both areas, severe slab damage appeared to be caused by moving debris rather than by overpressure from a blast.

In an effort to characterize the influence of the aircraft on the structure and, by extension, to characterize the loads on the structure, the team analyzed the available data to extract information about the destruction of the aircraft.

Most likely, the wings of the aircraft were severed as the aircraft penetrated the facade of the building. Even if portions of the wings remained intact after passing through the plane of the facade, the structural damage pattern indicates that the wings were severed before the aircraft penetrated more than a few dozen feet into the building. Ultimately, the path of the fuselage debris passed between columns 9C and 11D (figure 6.6), which were separated by approximately 28 ft at a depth of approximately 65 ft along the aircraft’s path. Columns 9C and 11D were severely distorted but still in place: hence the wings clearly did not survive beyond this point.

At a depth of approximately 160 ft into the building, columns 3G, 3H, 3J, and 5J (figure 6.6) were damaged but still standing, although in the direct path of the fuselage. With a maximum spacing of less than 14 ft between pairs of these columns in a projection perpendicular to the path of the fuselage, it is highly unlikely that any significant portion of the fuselage could have retained structural integrity at this point in its travel. More likely, the fuselage was destroyed much earlier in its movement through the building. Therefore, the aircraft frame most certainly was destroyed before it had traveled a distance that approximately equaled the length of the aircraft.

The debris that traveled the farthest traveled approximately twice the length of the aircraft after entering the building. To come to rest at a point 310 ft (figure 6.6) from the area of impact at a speed of 780 ft/s, that debris experienced an average deceleration of approximately 30g.

The influence of the structure on the deceleration of the aircraft (and, conversely, the influence of the aircraft on the structure) can be appreciated by comparisons with examples of aircraft belly-landed in controlled circumstances. In 1984, the Federal Aviation Administration (FAA) conducted a controlled impact demonstration
(Department of Transportation 1987) to evaluate the burn potential of anti-misting kerosene fuel. In that test, the FAA landed a Boeing 720 aircraft (weighing approximately 175,000 lb) without landing gear on a gravel runway at Edwards Air Force Base. The aircraft in that test was flying at approximately 250 ft/s when it made first contact, but it slid approximately 1,200 ft before it stopped. Although the test aircraft was traveling at approximately one-third the speed of the aircraft that struck the Pentagon, its sliding distance was approximately 3.9 times that of the Pentagon attack aircraft. Clearly, the short stopping distance for the aircraft striking the Pentagon derived from the energy dissipated through the destruction of the aircraft and building components; the acceleration of building contents; the loss of lift when the wings were severed from the aircraft; and effective frictional and impact forces on the first-floor slab, the underside of the second-floor slab, and interior columns and walls.

A study of the locations of fatalities also yields insight into the breakup of the aircraft and, therefore, its influence on the structure. The remains of most of the passengers on the aircraft were found near the end of the travel of the aircraft debris. The front landing gear (a relatively solid and heavy object) and the flight
data recorder
(which had been located near the rear of the aircraft) were also found nearly 300 ft into the structure. By contrast, the remains of a few individuals (the hijacking suspects), who most likely were near the front of the aircraft, were found relatively close to the aircraft’s point of impact with the building. These data suggest that the front of the aircraft disintegrated essentially upon impact but, in the process, opened up a hole allowing the trailing portions of the fuselage to pass into the building.

Several columns exhibited severe bends. However, the predominant evidence suggests that these columns generally did not receive impact from a single, rigid object. Instead, the deformed shapes of these columns are more consistent with loads that were distributed over the height of the columns.

The analyses of the available data reveal that the wings severed exterior columns but were not strong enough to cut through the second-floor slab upon impact. (The right wing did not enter the building at the point where it struck the second-floor slab in its plane.) The damage pattern throughout the building and the locations of fatalities and aircraft components, together with the deformation of columns, suggest that the entire aircraft disintegrated rapidly as it moved through the forest of columns on the first floor. As the moving debris from the aircraft pushed the contents and demolished exterior wall of the building forward, the debris from the aircraft and building most likely resembled a rapidly moving avalanche through the first floor of the building.

 

6.2 FIRE DAMAGE

Fire damage generally was similar to that normally resulting from serious fires in office buildings. Clearly, some of the fuel on the aircraft at impact did not enter the building, either because it was in those portions of the wings that were severed by the impact with the facade or with objects just outside of the building, or because it was deflected away from the building upon impact with the facade; that fuel burned outside the building in the initial fireball. Generally, fire damage to columns, beams, and slabs was limited to cracking and spalling in the vicinity of the aircraft debris. There were two areas with more severe damage. One area, to the north of the path of the aircraft, was bounded approximately by column lines 4, 7,A, and D. The other area, to the south of the path of the aircraft, was in the vicinity of column lines K and L and crossing column lines 11, 12, and 13. In both areas, there was more serious spalling and cracking than occurred typically throughout the fire area. Fire damage on the second floor in the vicinity of the path of the aircraft was generally more severe than in the same areas directly below on the first floor.

Comparing the state of damage in these columns with damage observed in laboratory fire tests of reinforced-concrete columns—made with concrete of similar compressive strength and subjected to well-defined heating regimes—may provide an indication of the lower bound of the maximum temperature reached at different locations in the Pentagon.

Figure 6.7 shows two 11.5 by 11.5 in. test columns that failed after more than three hours of exposure to standard fire ISO 834 (similar to ASTM E-119).The tests were conducted in Belgium at the University of Lie`ge and reported in Phan et al. (1997). The columns were made of C20 concrete (2,900 psi [20 MPa]), which is within the range of compressive strengths measured for concrete at the Pentagon. They differed in the reinforcements: one had eight 1/2 in. diameter longitudinal
rebars and the other had four 1 in. diameter longitudinal rebars. Both had a concrete cover of 1.2 in. Both columns carried an axial load of 50 percent of the room temperature capacity prior to fire exposure, and the loads were maintained throughout the heating process. The authors observed that longitudinal cracks and corner spalling, which are typical in concrete columns because of the large thermally induced transverse strains that are unrestrained in the transverse direction, occurred approximately one hour after exposure to ISO 834.This coincides with an ambient temperature of about 1,740°F (950°C).

Several structural elements in bays adjacent to the path of aircraft impact in the first floor did not sustain damage by impact. Rather, the damage to these elements was due to fire exposure. Because the structural elements in the Pentagon are believed to have had additional fire protection provided by the interior finishes—while the laboratory columns were fully exposed—and because the rate of temperature rise in the actual fire is believed to be greater than that prescribed by ISO 834, the comparison is not exact. However, it should provide an indication of the lower bound of the temperature at some locations in the Pentagon.

Figures 6.8 and 6.9 show first-floor columns 5M,5N,3M,and 3N at the time of the BPS team visit. These columns are located in Ring C, toward the end of the damage path. All four sustained thermal damage in the form of longitudinal cracks and corner spalling. Some sections of the columns appeared blackened, probably as a result of direct exposure to flame caused by partial loss of interior finishes. It took a little more than one hour of exposure to ISO 834—at a corresponding ambient temperature of about 1,740°F (950°C)—for the longitudinal cracks and corner spalling to develop in the laboratory test columns. This indicates that the temperature of the fire at this location might have reached a similar level.

Figure 6.8 First-story columns 5N and 5M

Figure 6.9 First-story columns 3M and 3N

 

Similar damage was also observed for columns 7J, 7K, and 7L—seen in figures 6.10 and 6.11—suggesting that the maximum temperature at these locations might also have reached 1,740°F (950°C).

Fire damage to the underside of the second-floor slab at some locations can also be compared with laboratory tests for an indication of the lower bound of the maximum temperature reached. Figures 6.12, 6.13, and 6.14 show the state of the fire damage, which included extensive thermal cracks and edge spalling of supporting beams and girders on the underside of second- and third-floor slabs. In laboratory fire tests of concrete slabs conducted by Construction Technology Laboratories, Inc. (Shirley, Burg, and Fiorato 1987), which exposed the undersides of four high-strength concrete slabs and one normal-strength concrete slab to an ASTM E-119 standard fire for four hours, it was reported that the normal-strength concrete slab attained a fire-endurance rating of 88 minutes, based on the temperature rise on the unexposed surface criterion. Eighty-eight minutes of exposure to ASTM E-119 is equivalent to a maximum ambient temperature of about
1,832°F (1,000°C). The exposed and unexposed surfaces of the test slab were monitored periodically throughout the four-hour test fire. The authors reported that no cracks were visible on the exposed surface of any slabs during the fire test. After cooling, the specimens did exhibit reflective cracking, which included hairline
cracks perpendicular to the slab edge at random locations along specimen perimeters. None of the slabs exhibited any spalling of the concrete surface during the test. As shown in figures 6.12–6.14, thermal cracks and edge spalling occurred on the undersides of some sections of the second- and third-floor slabs in the Pentagon. This indicates a more severe fire exposure at these locations; thus the standard fire exposure ASTM E-119 may prescribe the lower bound of the time-temperature curve for the real fire at these locations.

 

6.3 EXTERIOR WALL UPGRADES

The structural upgrades of the exterior wall performed reasonably well, considering that they were not specifically designed for aircraft impact. The only window frames removed by the impact were those struck directly by the wings or the fuselage. On the second floor, immediately adjacent to where the fuselage entered the building, upgraded windows remained in their frames even though the surrounding masonry facade was completely removed.

Upgraded glass was generally not broken immediately after the impact or after the ensuing fire had been extinguished. By contrast, most of the original windows in a vast area of Wedge 2 were broken after the fire was extinguished. It is probable that some of these windows were broken by the fire or by firefighting efforts rather than by the effects of the impact.

(back to top)

 

7. ANALYSIS

The work detailed in the previous section suggests that there are three issues of structural performance that require analysis. First, the impact of the aircraft laterally loaded a large number of spirally reinforced columns. It is important to note that the response ranged from complete removal of the columns to inconsequential damage. Second, a portion of the structure in which many of the columns had been destroyed by the impact remained standing. As such performance is to be desired, the reasons for it are of interest to the engineering profession. Third, a limited collapse occurred roughly 20 minutes after the impact of the plane. This calls for an examination of the fire loading of the structure in this interval. Comprehensive analyses of these three phenomena could be performed, but the fidelity of the available input and response data is not on a par with the demands of such attempts. The following sections contain quantitative data based on simple calculations to provide a perspective on the toughness of the structure and the effect of the fire.

 

7.1 RESPONSE OF COLUMNS TO IMPACT

The structural elements of the Pentagon that bore the brunt of the airplane impact were the first-story columns. The locations of the columns in the area affected by the impact and the ensuing fire are shown in figures 6.2 and 6.3 (section 6). All columns in the first story had square cross sections and spirally reinforced cores with a concrete cover of 1 1/2 in. The story height was 14 ft 1 in. There were two different arrangements of longitudinal reinforcement as shown in figure 7.1. The side dimensions varied from approximately 1 ft to 2 ft. Longitudinal reinforcement ratios ranged from approximately 1.5 to 2.5 percent. The minimum spiral reinforcement ratio was 1.3 percent.

Moment-curvature relationships for these columns were calculated assuming a mean concrete cylinder strength of 4,000 psi and a yield stress in the longitudinal reinforcement of 45,000 psi. For the concrete stress-strain properties, two different assumptions were made, as shown in figure 7.2. Assumption 1 was used for the gross area of the column treated as a “tied” column and corresponds to unconfined concrete, with the compressive strength of the concrete in the column 85 percent of that in the test cylinder. Assumption 2 was used for the core of the column confined by the spiral reinforcement. For the confined core, the limiting strain was defined to be that corresponding to the fracture of the reinforcement at a unit strain of 0.2. For calculating the relationship between the resisting moment and unit curvature for each type of column, an estimated service load was used reflecting the tributary dead load of the structure. A representative example of the calculated moment-curvature relationships is provided in figure 7.3. The spirally reinforced concrete core had a considerably higher calculated limiting unit curvature capacity than that calculated for the gross section of the column treated as a “tied column.” The spiral cores possessed two other important properties not evident in those plots that define only cross-sectional response:

1) The cores enclosed by spiral reinforcement had shear strength higher than the shear corresponding to that associated with the development of the flexural strength of the core under lateral loading. For the limiting static uniform load corresponding to the critical failure mechanism, the maximum unit shear stress did not exceed three-fourths of the estimated unit shear strength of the core.

2) The longitudinal bars had sufficient anchorage to develop their strengths.

These two properties eliminated the possibility of brittle failure of the cores. Indeed, none of the columns was observed to have failed in shear, and there was no evidence of pull-out of reinforcing bars. The cores and their connections did not unravel under impact. Destroying the column core required tearing it off its supports. The longitudinal reinforcing bars at ends of the severely damaged columns were observed to have fractured after necking, indicating ductile failure.

The plot describing the response of the gross section of the columns (tied columns) refers to a section subjected to flexure with the shell concrete intact and assuming that the shear stresses would not precipitate failure. Had the columns been tied columns—that is, columns without spiral reinforcement confining the core—even the modest unit-curvature limits shown in the figures would not have been attained because shear failure would have preceded development of the yield moments at the critical sections.

The impact effects may be represented as a violent flow through the structure of a “fluid” consisting of aviation fuel and solid fragments. The first-story columns in the path of this rushing fluid mass must have lost their shells immediately on impact. The curves with the higher moment capacities are, in effect, irrelevant for the affected columns. It is very likely that there was never a finite time in which the affected columns responded as tied columns. The column shells must have been scoured off on first contact with the fluid. Bending resistance to the pressure created by the velocity of the fluid must have occurred in the cores only. The limits of the moment-curvature relationships for the column cores shown were based on a nominal fracture strain of 0.2 in the reinforcement in tension. Considering that the axial loads were relatively lig